Orion Marine Group Pasadena, Texas Beard was awarded a contract to haul and place material for levee construction. Scope of work included clearing and grubbing 100 acres and excavating 500,000 cubic yards of material to raise levees.

Learn More

Beard was awarded multiple contracts associated with the construction of a new liquid gas transfer facility for Murphy Energy. The facility will be used to unload petroleum products from 18-wheel tank trucks, store them and pump them through a 6-inch pipeline under the highway to the Colonial Pipeline facility located across the highway. Beard’s scope of work included site preparation, concrete paving, infrastructure and asphalt turning lane for the 30-acre liquid gas transfer facility.

Learn More

Beard Construction Group, LLC was awarded multiple contracts associated with Impala’s A-G Coal & Bulk Materials Terminal Restart/Expansion. Trafigura/Impala plans to invest around $100 Million to reopen the currently idled Burnside facility as a state-of-the-art major bulk terminal for coal, bauxite and alumina. It will be only the fourth facility—and the only one with the possibility of both rail-to-vessel and barge-to-vessel capabilities—on the Mississippi and is set to become one of the top ten coal and bulk logistics facilities in the USA.

Learn More

Beard was awarded contracts to perform the site preparation, storm drainage and base course for Nucor Steel Louisiana’s $750 million direct reduced iron (DRI) facility in Convent, LA. Upon completion, the iron making facility will produce 2,500,000 tons-per-year.

Learn More

Beard was awarded the site-work and underground utilities package for Myriant Technologies’ Bio-Succinic Acid Plant in Lake Providence, Louisiana. Upon completion, the plant will produce 30 million pounds of bio-succinic acid annually and be the largest facilitiy of its kind in the United States.

Learn More

Beard was awarded the $5.18 Million contract for the Warehouse Building #1 Truck Dock and Interior Roads & Paving project at SNF’s new $400 million Plaquemine Polymer Plant. Construction activities included fine grading, installation of 6” of #57 limestone, 8” paving and trenches for interior roads, truck dock, and paving around buildings. Additional contracts were awarded, totaling $7.29 Million.

Learn More

Beard was awarded a contract to construct a new solid waste disposal unit at DuPont’s DeLisle Plant, which included site preparation; clearing/grubbing; silt fence installation; clay excavation & stockpile; embankment; limestone for top of road berms; compacted clay liner; geosynthetic clay liner; 542,000 SF of 60 mil flexible membrane liner; composite drainage layer; 20,100 CY 12″ protective layer; topsoil; leachate collection system; erosion control, etc.

Learn More

dora_tn

Republic Services Dora, Alabama Beard Construction Group was awarded a contract to construct a 5.8 acre landfill cell and 15 acre closure at Republic Service’s Pineview Sanitary Landfill in Dora, Alabama.

Learn More

150x150

Georgia-Pacific awarded Beard Construction Group, LLC the site-work for the Towel and Tissue Paper Machine Addition project at their Port Hudson mill in Zachary, LA. The scope of work includes excavation and embankment, imported fill material, limestone, and installation of the well water system, firewater system and storm sewer system.

Learn More

150x150

Beard Construction Group, LLC was awarded the $3 Million contract to perform site-work associated with Georgia-Pacific’s Towel and Tissue Paper Machine Addition project at their Integrated Pulp and Paper Mill in Crossett, Arkansas. Beard was awarded an additional $2 Million contract for the site utilities and additional parking.