Scope of Work :
- Clearing & Grubbing
- Silt Fence
- Excavation/Stockpile
- Compacted Clay Liner
- Protective Cover
- Crushed Limestone
- Geotextile Fabric
- Geosynthetics
Scope of Work :
The Chemours Company awarded Beard a contract to construct a new Waste Disposal Unit at their facility in DeLisle, Mississippi. BCG’s scope of work included site preparation; clearing/grubbing; silt fence installation; clay excavation & stockpile; embankment; limestone for top of road berms; compacted clay liner; geosynthetic clay liner; HDPE liner; composite drainage layer; 12” protective layer; topsoil; leachate collection system; erosion control, etc.