Beard was awarded multiple contracts associated with the construction of a new liquid gas transfer facility for Murphy Energy.  The facility will be used to unload petroleum products from 18-wheel tank trucks, store them and pump them through a 6-inch pipeline under the highway to the Colonial Pipeline facility located across the highway.  Beard’s scope of work included site preparation, concrete paving, infrastructure and asphalt turning lane for the 30-acre liquid gas transfer facility.

Site, Concrete & Infrastructure Scope:

  • Clearing & Grubbing
  • Stripping
  • Excavation/Embankment
  • Structural Fill
  • Erosion Control
  • Storm Drain Pipe
  • Limestone Paving
  • Concrete Foundations & Paving
  • Carbon Steel Pipe

Turning Lane Scope:

  • Demolition
  • Traffic Control
  • Sub-grade Prep
  • Limestone Base Course
  • Asphalt Paving
  • Pavement Striping